END-OF-CHAPTER PROBLEMS

4.5)
Problem 4.5aProblem 4.5bProblem 4.5c

4.9)
Problem 4.9a

Problem 4.9d
Since exponential smoothing with alpha = 0.5 has the lowest MAD it would be preferred.

4.22)
Problem 4.22

4.23)
Problem 4.23

Note:  Management provided its forecasts for only the last four months.  However, we could provide Naive forecasts for the months of August through June, and compute MAD and MAPE based on those months:
Problem 4.23a
Since both the MAD and MAPE have improved we would still be inclined to prefer the Naive technique.


4.31)
Problem 4.31a
Problem 4-31a2
Problem 4.31b



Back
Home